The second stage of the 21.6 hectaregreenhouse, which was the first stage ofthe 3-stage project of approximately 68hectares. The construction of thesecond stage is finished and thewindows are already installed. Thepackaging area of the general project isapproximately 8.840m². The currentproject, financed by European banks, isplanned to start production in 2019